The shell forms the skeleton of your building, it is critically important to make it as strong and sturdy as possible. It is never seen in the finished product, but it’s typically both the most important and the easiest part to cut corners on. It’s important to have a trusted, reputable team working on your project.

Our value is felt from the beginning of every relationship and every project. We start with a meticulous review of the plans and specifications looking for value engineering possibilities. Our highly trained and experienced project supervisors are skilled at integrating select trades and supply chain activities in order to optimize efficiency, safety and quality control. Centerpoint Construction’s services are comprehensive, providing a single point of contact for clients and a constant focus on scheduling, quality control, risk management and superior customer service.

Our standard scope of work provides the labor and materials for:

Foundation Systems Including:

  • Install pilings (auger cast or helical pier)
  • Stem Wall
  • Grade Beam
  • Structural Slabs
  • Monolithic Foundations
  • Cast in Place

Bearing Wall Systems Including:

  • Concrete Masonry
  • Framed Exterior Wall
  • Interior Bearing Wall
  • Cast in Place

Deck Systems Including:

  • Cast in Place
  • Wood Joist
  • Bar Joist
  • Post Tension
  • Hambro
  • Hollow Core
  • Aerial
  • Epicore
  • Cast in Place Steps and Stairs
  • Rough Wood Stair Systems

Typical Rough Carpentry Scope Including:

  • Roof Trusses
  • Roof Sheathing
  • Soffit Sheathing
  • T&G
  • Outlookers
  • Outriggers
  • Structural Rafters
  • Hand Framed Heavy Timbers